News
-
The key role of three-phase ac flow control load box in marine engineering
In this context, the three-phase ac flow control load box plays an irreplaceable role as an important tool for testing and debugging the power system.
Learn More2025-06-17 -
What is the core working principle of the three-phase AC flow control load box?
The working basis of the three-phase AC flow control load box starts from the input link of the three-phase power supply.
Learn More2025-06-04 -
How does the charging gun comprehensive tester support charging gun tests of multiple international standards?
In this process, technological innovation and practical application are closely combined to jointly promote the progress and improvement of charging infrastructure.
Learn More2025-05-20 -
What impact does the temperature and humidity environment simulation of the charging gun comprehensive test system have on the test results?
In the charging gun comprehensive test system, temperature and humidity environment simulation is an important link.
Learn More2025-05-07 -
Three-phase AC flow control load box is a powerful tool for rapid response to sudden changes in power demand
As an advanced power testing and regulation equipment, the three-phase AC flow control load box plays an irreplaceable role in dealing with such emergencies with its rapid response capability.
Learn More2025-04-22 -
Dongguan Zhongjia Testing Equipment Technology Co., Ltd. Was Awarded the High-Tech Enterprise Certification Providing Excellent Testing Solutions for the Charging Gun and Charging Pile Industry
On December 28, 2023, Dongguan Zhongjia Testing Equipment Technology Co., Ltd. received good news. The company officially obtained the high-tech enterprise certificate issued by the relevant national departments.
Learn More2025-03-31